A battery can look like the obvious next purchase after solar panels. Its usefulness, however, depends on the energy available to store, when your household needs it and the value of moving it from one time to another. Start with those questions before selecting a capacity or comparing headline equipment prices.

For a new house, timing also matters. The design team may be able to plan an appropriate location and system arrangements before you decide to buy storage. That preparation does not require committing to a particular brand, nor does it guarantee that any future equipment will be compatible.

Compare consumption and generation over matching periods

Obtain hourly data, or the available time resolution, for electricity use, generation and exports. Identify the period and where the information comes from. An annual bill provides context, but it does not reveal how much lunchtime surplus could be used later. If the home is not occupied yet, use clearly described scenarios and revisit their assumptions.

IDAE distinguishes consuming generation as it occurs from storing surplus for later use, which requires additional investment. First consider whether some electricity use could move into solar hours. Do not attribute savings to a battery when changing the timing of an appliance would already achieve them without that equipment.

A holiday home needs separate occupied and unoccupied scenarios. A household working from home may already use a substantial part of its generation during the day. Similar annual consumption totals can therefore imply different storage requirements. Ask the designer to explain the pattern behind the recommendation.

Keep energy capacity, power and backup separate

Kilowatt-hours describe an amount of energy; kilowatts describe the power available at a particular moment. Request usable capacity, continuous output, operating limits and compatibility with the proposed system. Enough stored energy does not necessarily mean the equipment can run every desired appliance simultaneously.

Power-cut protection also requires the right configuration. As a concrete example, Tesla documents a non-backup Powerwall 3 arrangement that does not supply the house during a grid outage. The lesson is to specify the backup function explicitly rather than assuming it accompanies every storage installation.

Match the technical question to your objective
ObjectiveInformation to requestUseful check
Use daytime surplus laterEnergy that can actually be shiftedConsumption and generation from matching periods
Keep equipment running in an outageBacked-up circuits and available powerAgreed configuration and installer testing
Expand the system laterCompatibility and expansion conditionsEquipment documentation and future work scope

Calculate the value of shifting energy

The financial value is not simply the battery's capacity multiplied by the electricity purchase price. Storing surplus may mean giving up the payment or credit that exporting it would have produced. Energy returned for use is also different from energy charged. Compare consistent figures using the terms of the actual supply agreement.

Here is a purely illustrative calculation, excluding taxes, fixed charges and any market forecast. Suppose 6 kWh that would otherwise be exported are charged, with an assumed 90% efficiency. That returns 5.4 kWh. At hypothetical values of €0.25/kWh for avoided purchases and €0.08/kWh for exports, the avoided purchase is €1.35 and the lost export value is €0.48. The difference is €0.87 for that cycle.

This is not a promised daily saving. It assumes the surplus is available, the recovered energy can all be used and the two values represent the relevant contract terms. It also excludes degradation, maintenance and finance. Repeat the exercise for different seasons and occupancy patterns before making an annual estimate.

Compare the installed system rather than the box

Request an itemised scope covering storage, compatible equipment, protection, controls, distribution-board changes, wiring, installation, configuration and documentation. If backup is required, ask what additional work it needs and which circuits it will serve. Identify taxes and exclusions so competing offers describe the same outcome.

For a new build, include the proposal in the construction budget. The plot's electricity connection is a related but separate matter: a battery does not by itself establish the availability or terms of a mains connection. Coordinate those questions rather than allowing them to disappear between suppliers.

Use the whole-project budget calculator to place the proposed investment alongside the other costs. Homef's solar planning tool can help explore an initial photovoltaic scenario. Preliminary estimates support comparisons; technical sizing and feasibility still require assessment of the particular home.

Plan a suitable location and realistic maintenance access

Ask the technical team to assess access, environmental conditions, clearances and the manufacturer's requirements for the proposed location. Do not select a position only because the equipment will be hidden. Installation, inspection, maintenance and eventual replacement all need appropriate provision.

Include these requirements in the house design brief. If your broader aim is lower energy consumption, also review the Passivhaus design guide. Storage manages available energy; the building project should separately consider the demand the system will need to serve.

Read the warranty through practical questions: what is covered, which conditions apply, how is a fault reported and who provides assistance? Distinguish equipment warranty terms from installation work and the relevant contractual responsibilities. Keep the delivered configuration and commissioning information with your house records.

Request options that make the trade-off visible

Compare a system without storage, a storage option and the backup arrangement you actually need. Where data are missing, ask what additional measurement would make the decision more dependable. A useful proposal should explain the circumstances in which storage contributes value and the expenditure associated with choosing it.

Include milestones, testing and handover documents in the agreed contract scope. Avoid accepting a presentation about independence as a substitute for defined equipment and circuits. It is reasonable to defer the purchase when the evidence does not yet justify it.

Tell us how you will use the house, whether solar panels are already installed and what you expect a battery to achieve. Those details create a much stronger starting point than choosing a capacity from a photograph.

Sources and further reading

Sources checked on 22 September 2026. Your property documents and local requirements determine how the guidance applies to your project.